- Home
- References
- Projects
Projects
In the project case studies, you can read how our customers' projects went: the starting point, the approach step by step and the result with verifiable figures. If a customer does not wish to be named, the case study appears in anonymised form, without names and without details that would allow conclusions to be drawn.
All project case studies
- Xaver Kirchhoff GmbH: data centre move to a new infrastructure
Xaver Kirchhoff GmbH, an electrical installation company with 20 to 49 workstations, now works in the conpro IT data centre environment. The important services and data were moved within one day, with minimal disruption to work.
- Test lab for 5G applications with a 10 Gbit network for a research company
A research company tests 5G applications in a test lab that simulates mobile 5G networks. conpro IT supplied hardware, built the 10 Gbit network with technology from FS and supports the test lab on an ongoing basis.
- Server cluster: Proxmox VE with Ceph on four servers
In 2026, a cluster of four servers with Proxmox VE and Ceph replaced a grown virtualisation environment. More than 150 virtual machines run on it, and it passed the failure tests.
- Fortinet cluster and restructured network for a service provider
A service provider with 100 to 249 employees renewed its firewall, internet connection and network during ongoing operations. The bandwidth increased from 1,000 to 5,000 Mbit.
- Hyper-V replication across two sites: recovery in under 30 minutes
A service provider with 20 to 49 employees replicates its servers to a second site every 5 minutes. The nightly backup now takes only about 1 hour instead of about 6.
Each result is an individual case and depends on the respective starting point.